Server IT Audit Technical Requirements

Supported Operating Systems:

1. Microsoft Windows NT 4.0 (Service Pack 4 or 6a)

2. Microsoft Windows 2000 Server

3. Microsoft Windows 2003 Server

4. Microsoft Windows XP

5. Red Hat Linux 7.3, 8.x, AS 3, ES 3

6. Solaris on Sparc v8, v9 & v10

7. Solaris on x86 v9 & v10


Back to top

Minimum Requirements For Server Inventory and Data Collection:

For Windows Servers:

1. No previous security hardening or security modifications

2. Windows Management Instrumentation (WMI) is installed and running

3. DCOM is enabled

4. RPC service is running

5. Remote registry service is running

6. File and Printer Sharing for Microsoft Networks is installed and enabled

7. Administrative shares Admin$ and C$ on the source server are accessible from the IT Audit Server

For Linux / UNIX Servers:

1. SSHD installed and running

2. Available administrative or root account with shell access


Back to top

Networking Requirements:

LAN/WAN ports, firewalls and security devices must allow traffic between the collection server and servers from which data is collected

For Windows Servers:

1. 53               TCP/UDP     Domain

2. 88               TCP/UDP     Kerberos

3. 123             UDP             Time

4. 137             UDP             NetBIOS-ns

5. 139             TCP              NetBIOS-ssn

6. 389             TCP/UDP      LDAP

7. 3268           TCP              LDAP to Global Catalogue

8. 135/445      TCP              For DCOM/RPC communication using WMI for Windows servers

Back to top

Prerequisites and Assumptions

1. Prior to commencement of onsite services, networking and power must be provided as per the pre-service check list

2. A single point of contact will be designated to coordinate access to the required personnel and equipment.

3. Q Associates Consultants will have access as needed to the system and network administrators as part of the initial setup process.


Back to top



Service Schedule

Pre-Engagement Conference Call

1. Introduce key participants

2. Work with client to start server candidate inventory

3. Complete install checklist

4. Run Pre-Install analyzer tool to gather accurate inventory and test protocols and ports needed for the project


Back to top

Installation

1. Run inventory job for agreed server inventory list

2. Run performance collection

3. Resolve rights/firewall issues

4. Verify data collection

5. Verify performance counters


Back to top

Post Installation

1. Review findings

2. Complete consolidation report

3. Review virtualization guidelines and concerns

4. Review consolidation scenarios

5. Next steps

Back to top
INTERESTED IN OUR IT AUDIT SERVICES?
Click Here
to contact Q Associates for more information on what we can do for your company, alternatively call us on +44 (0) 1635 248181


Q Associates | Langley Business Court, Beedon, Newbury, Berkshire RG20 8RY | Phone: 01635 248181 | Fax: 01635 244301
© Copyright 2006 Q Associates and its licensors - All Rights Reserved.